Heat management of the city of Třebíč

  • Venue: Třebíč
  • Country: Czech Republic
  • Year: from 1995 – present
  • Segment: municipal heat management

The city of Třebíč gets its heat supply from the company TTS energo s.r.o., for its households, elementary schools, preschools, the Třebíč hospital, the Vltavínská Health Centre, nursing homes, production companies and others. In 90 %, the heat supply is provided from the centra heat supply system for more than 9,700 households.

 

The entire system of heat and energy management operated by TTS energo s.r.o. includes:

1. Heat production and supply in the following facilities

  • Source Distring Heating Plant Teplárna SEVER
  • Source Distring Heating PlantTeplárna JIH
  • Source Distring Heating PlantTeplárna ZÁPAD

2. Electric energy production and supply

  • Source Distring Heating Plant Teplárna SEVER – electricity production for own source supply and supply into the E.ON distribution network
  • Source Distring Heating Plant Teplárna JIH – electricity production for own source supply and supply into the E.ON distribution network
  • Source Distring Heating Plant Teplárna Západ – electricity production for own source supply and supply into the E.ON distribution network

3. Operation of gas pipelines and supply of natural gas

  • gas distribution system in municipalities – Budíkovice, Pocoucov, Okřešice
  • gas distribution system in municipalities – Račerovice, Sokolí

4. Providing the operation of home delivery stations and gas boilers

  • Providing the operation and management of home delivery stations
  • CONTINUOUS monitoring of operation of the heat sources and heating networks by the central dispatching

TTS energo s.r.o. main activity is the provision of permanent heat supply to clients in the required quality and time. The dispatching operates 24 hours a day, 365 days a year.

 

The entire energy system of the city has been built gradually using AMiT control systems. The central dispatching is built on the technology of LookDet supervisory system, which currently includes not only energy technologies of the city of Třebíč.

Current use of the supervisory system (2017):

  • 37 large sources (data transfer period is 15 sec)
  • 239 exchanger stations (60 sec)
  • 96 meters working via AMiT control systems (24 h)
  • 503 M-Bus meters (24 h)
  • 9 photovoltaic power plants
  • total 370 control systems
  • 35,000 binary signals, 11,000 analogue data
  • 100 users, 6 service stations